EDG · Act
T−72hJetora
When the ground can’t reach in time.
Jetora runs risk and burn models on board, inside limits you approve.
- Next ground pass~95 min
- Ground plan + uplink~40 min
- On board, Jetora< 1 s
Design target Time from a late-breaking threat to a staged burn.
T−62hWhat it does
Six things it does well.
On board
Compact Riskor and Maneva models on Jetson.
Fast
Sub-second response inside pre-approved envelopes.
Ground veto
Operators can always cancel.
Autonomy ladder
Advisory first; more only when earned.
Full logs
Every decision recorded on board.
Fleet updates
Over-the-air model updates. Planned.
T−51hAutonomy
Earned one rung at a time.
- L0AdvisoryOrbeena suggests. People decide and fly.
- L1Operator-approvedOne-click approval of a planned burn.
- L2SupervisedRuns on its own; the ground can veto.
- L3Bounded autonomyOn board, inside a pre-approved envelope.
Planned Each operator chooses the rung. Orbeena starts at L0–L1.
T−41hHow it works
Inside Jetora.
- 01
Distill
Shrink ground models for the edge.
- 02
Qualify
Test in Orbix against thousands of cases.
- 03
Deploy
Ship to the bus with an envelope.
- 04
Watch
Telemetry flows back to improve models.
T−31hSpec
Specification.
| Item | Detail |
|---|---|
| Hardware | Jetson-class modules (planned) |
| Modes | L0 advisory to L3 bounded autonomy |
| Envelope | Max burn, keep-outs, timing |
| Logs | On board, downlinked each pass |
| Status | Planned |
T−21hIn the loop
Where it sits.
T−10hQuestions
Short answers.
Is it flying today?
No. Jetora is planned. We start on the ground.
Who sets the limits?
You do, per satellite and mission.
TCAClosest approach
Bring one constellation. See what’s really coming.
A 45-minute screening of your fleet against the public catalog, with our flight dynamics team.